Jim Davis - 1204th Engineer Fire Fighting Platoon
#1

Hello Marion,

 

Thanks for the info. Sorry, can't help the gentlemen. We had no contact

with Engineer units, other than our own kind, during the war with one

exception. That was an Engineer Combat or General Service, Battalion or

Regiment who was rebuilding a railroad bridge on the Durance River at

Meyraguess in Southern France not long after the August 15 1944 landing.

The bridge was a Bailey, a triple/triple and the longest Bailey put up to

date at that time, reportedly. The length I have forgotten if ever knew.

But it was so long it required two supporting piers to hold it up. Our job

was to pump out the water in pier footings created by driving sheet piling

into the river bed. With the water out concrete could be poured. We used

fire trucks and trailer mounted fire fighting pumpers 24/7 for several days

and then moved on north with the advancing 7th Army of which we were a part.

 

Have no pictures, just memories as enlisted could not have cameras.

 

Aloha,

Jim

 

 

Marion's note: Posted this here for our friend and forum member Jim Davis.

 

James G. Davis, Member and Historian

1204th Engineer Fire Fighting Platoon

World War II

Author: "Fire Fighters in Fatigues - The 1204th Engineer Fire Fighting Platoon - A History"

 

http://www.maui.net/~r11/index.html

 

Marion J Chard
Proud Daughter of Walter (Monday) Poniedzialek
540th Engineer Combat Regiment, 2833rd Bn, H&S Co, 4th Platoon
There's "No Bridge Too Far"
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  1989th Engineer Aviation Fire Fighting Wendy 1 2,977 10-13-2011, 09:19 AM
Last Post: Walt's Daughter
  Engineer Fire Fighting Platoon patch Walt's Daughter 1 4,217 09-10-2011, 08:20 AM
Last Post: Walt's Daughter
  Jim Davis' After photos of the bridge at Worms Walt's Daughter 0 2,601 09-06-2011, 08:10 AM
Last Post: Walt's Daughter



Users browsing this thread: 1 Guest(s)